What we deliver
Civil Construction
Earthworks, pavement build-up, kerb and gutter, drainage and concrete works.
The short version
Most pavement failures are decided below the surface. Subgrade correction, layer thickness and drainage do more for the life of a road than anything laid on top of them, and they are the cheapest things to get right.
01What we control
Subgrade proved before it is covered
Proof rolling, correction of the soft spots the profiler exposes, and levels surveyed and confirmed against the design before material is ordered.
Pavement layers to specification
Subbase and base constructed and compacted in layers at the depths the design calls for, with the moisture content managed rather than hoped for.
Concrete works detailed, not copied
Kerb and gutter, footpaths, vehicle crossings and industrial slabs, with jointing and reinforcement set against the loads and the subgrade.
Drainage that is actually graded
Water sitting on or under a pavement is the single most common cause of early failure. Falls and pit levels are checked on site, not assumed from the drawing.
Let's Talk About Your Project.
Whether you are planning a new project, maintaining existing infrastructure or seeking experienced project management support, we are here to help.